Solution
Indoor measurements and DAS acceptance testing
Position each measurement on the floor plan and verify the acceptance criteria: level, quality, dominance, uplink.
Method
Four-step workflow
- 01
Prepare
Floor plans calibrated on two reference points; written route covering the building perimeter, corridors, stairs and elevators.
- 02
Survey
Waypoints placed on the floor plan; multi-operator fleet controlled from the tablet.
- 03
Analyze
Floor plan colored by SINR, delta to the best neighbor, cells detected per floor, transmit power.
- 04
Sign off
Acceptance criteria verified zone by zone, re-measurement after correction, report per floor.
Features
Features used
- Floor plans calibrated on two reference points
- Waypoints placed with a single tap, multi-floor surveys
- Indoor replay colored by KPI
- Dominance and delta to the best neighbor
- Transmit power and uplink link adaptation
- Comparison before and after correction